It is found that a radius of 0.35 exhibits the best forecasting results for this set of input and output. Across the three buildings, the change in the radius is only of the order of 0.5 to 0.1 and can be conveniently scripted. The results obtained are presented in Table 3 and the plot for building A is presented in Fig. 7.