4.2.1 Introduction
Due to the lack of subsurface drainage system in the original design, the method of controlling the subsurface water level becomes a challenging task. There are several uncertainties in the effectiveness of implementing a particular water level controlling scheme. Therefore, the proposed water control scheme would have to be divided into three (3) stages with possible modifications according to the actual field performance in each stage. The stages of the work are as follows: