Part 2 Verification of Load Conditions
2.1 Is there any areas not accessible during Audit for visual
inspection:
- Reasons
-Assessment of whether such areas are critical to overall structural integrity of the building
2.2 Is there any manager in charge of verification on Load? Give his name, and background
2.3 Is there evidence that maximum loads have been calculated for each area of the building? What are they and how have they been calculated?
2.4 ls the load plan available, and maximum loads posted at each floor of each building in the factory?
2.5 How does factory monitor the actual load at each floor of the factory?
2.6 Is there any misuse, abuse or deviation from intended use of a floor/building?