3.1. Selecting the workload control strategy
Fig. 2 shows time in system behaviour for each one of the workload control strategies. These are the results of keeping the value of each factor in the reference level, underlined in Table 2, when the workload control factor is varied. Only workload norms have been fully varied in combination with the workload control strategy.