Sodexo preliminary report that the pipeline air cooling at lobby hall 5 leak causing the smoke out of the distribution area at 17.15 hrs. because seamless tube for air conditioning and refrigerant leak that edited by closing air pipe and brought 2 mobile cooler to supportat 17.30 hrs. Air cooling return to work normally at 20.00 hrs.