Hong Kong has nine existing container terminals with a total of 24 berths at Kwai Chung and Tsing Yi Island, operated by several private consortia. Through various productivity enhancement measures, their combined throughput capacity is some 20 million TEUs per year.
In December 2014, the Hong Kong government released findings of the Study on the Strategic Development Plan for Hong Kong Port 2030 (HKP2030) and the Preliminary Feasibility Study for Container Terminal 10 (CT10) at Southwest Tsing Yi. Although the preliminary PFS findings show that CT10 development is technically feasible, the project is not viable financially or economically due to slow throughput growth. Further, with appropriate measures expected to enhance the handling capacity of existing terminals to cope with future growth, planning for CT10 before 2030 is therefore not recommended.