As an example, an airport decides to build a new terminal. During the planning and design
phases, the location and the size of the terminal are defined, and any impacts to the airfield.
Many potentially, permanent hazard conditions can be avoided through an effective planning
phase SRM—line-of-sight limits on the ATCT personnel, airspace impacts, potential interference
with existing and/or proposed surveillance equipment are just a few.