before open the door, to turn off water circulating pump and cool water tower switch first.open the valve of door's right side to broken vacuum,let vacuum intensity goes down to 400mm-Hg and switch off the vacuum pump.until pot becoming normally pressure,status, then to open the door. loosen top cover of basket and take out all baskets. obviously, all fry process are completely