Test, Inspection and Test Report
The proposed photocontrol shall have successfully passed surge test end l0ll1d test
as specified in the relevant reference standard. Load test report of photoco 1trol with
voltage of 120 V or 240 V are acceptable. Test report of identical units are a::ceptable,
Surge test report and load test report of the proposed photocontrol or a letter of
confirmation that test report wiU be submitted to MEA 15 ( fifteen} days afte openitl~ date
shall be attached to the bid. If the test reports are not delivered to MEA ~~thin :15 days.
after the openin~ date , MEA will not consider such offer.