Costs are assigned to jobs in the following manner:
1. Raw materials attach to jobs via material requisitions.
2. Direct labor attaches to jobs via direct labor tickets.
3. Overhead cannot be attached to jobs directly but must have an allocation procedure that
relates it to one of the resource factors, such as direct labor, which is already accumulated by the job.