The current Custom office's level at bounded yard is lower than carpark level due to top-up of existing carpark level. The perimeter drain of custom office was choked with debris/back filling soil, as the result the rain water could not dischage into road crossing pipe line.
Please refer the photos taken as per joint inspection carried out with Mr Manny.
Please clear the perimeter drain immediately to avoid the rain flood the custom office.