As can be seen in Fig. 11, the turbines are not all
connected to the same busbar. In both process units there are
sufficient turbines to allow loads to be supplied should that
part of the plant be islanded from the utility and from the other
process unit. This requires that the PMS load shedding
algorithms ensure sufficient generation in each process area
to avoid loss of production should any islanding occur.