1. Working Demolition of Equipment
1.1 Demolition pole 9 meter
1.2 Demolition pole 12 meter
1.3 Demolition the equipment all kinds off
2. installation of a new transformer.
2.1 Installation pole 12 meter
2.2 Add wire electric THW-A 1 * 50 Sq.mm system 22 kv.
System Ground
Pour casting mast
The components in the assembly
3. The fee for the electrical contact.