KTIS Group is always one of the most valued costumers of CWPC,and we have dispatched three engineers to Ekaluck power plant:Zhao Kun(electrical engineer), Li Shenglei(boiler engineer), Lin Chenqian(control & instrument engineer) to push forward the project schedule. And the site engineers of TEP witnessed our engineers are work hardly with the erection agency everyday.