Debris removal was found to differ significantly between the contractors (t-statistic = 4.3, df = 49.28, p < 0.001) such that Contractor Y removed more trap debris per day (87.71 ± 9.48, mean TEUs ± SE) than Contractor X (44.17 ± 4.88, mean TEUs ± SE).