L-9 "Fire Proofing:
1) Fireproofing material shall be standard weight concrete and shall be installed in acccordance with this drawing.
2) Wire fabric shall be galvanized 50mm x 50mm x 2mm x 2 mm (2""x2""x14/14) stood off surface of structural steel member by 38mm. (1 1/2""). Standoffs shall be nelson R6P ""T"" notch studs or equal.
3) Caulk shall be foster 95-44 or approved equal.
4.) Final surface shall be smooth.
5) All standoffs shall be placed no more than 10mm from edge of steel and no more than 300m part along member.
"