Regarding to foundation works (F2 / Line6-E) , pile miss alignment 10 cm. form center point,
therefore we had correct action by
1.) Increase length of dowel bar in footing to 60 cm. made total footing length is 150 cm.
2.) Added footing re-bar are 9-db16 (short side) and 4-db16(long side)