• measurment and verification
• maintenance
• performance monitoring
• ongoing training services
• other costs/fees (specify)
Table 1 : Detail of Equipment for each ECMs
Table 2 : Detail of Manpower, Instrument
The Report shall describe the ESCO's plan for installing or implementing the measures in the Facility(s),
including all anticipated hard and soft costs associated with such installation and implementation.
Annex II)
The primary purpose of the Report is to provide an engineering and economic basis for negotiating the
guaranteed energy savings contract between the Customer and The ESCO; however, the Customer shall be
under no obligation to negotiate such a contract.
2. Records and Data
During the Study, Customer will furnish to The ESCO upon its request, accurate and complete data
concerning current costs, budgets, facilities requirements, future projected loads, facility operating
requirements, collective bargaining agreements, etc. The ESCO w
required information and Customer shall make every effort to provide that information within 5 days of
request.
3. Preparation of Implementation Contract
Along with the other Scope of Work required under this Agre
the subsequent Implementation Agreement and the Financing Agreement if applicable. These Agreements
shall be co-developed by The ESCO and Customer during the IGA. These documents will vary dependant on
the Customer desired structure, but where possible shall be standardized The ESCO documen
expedient delivery.