As you may be aware, we are dealing with a fairly significant issue on the Lombard program in topple drop failures (this is different from the modulation failures). As part of the investigation we are investigating pitch and clearance as KPIVs to the issue. We have a sorting request to sort based on Chirp to do a sliver build at drive level to further investigate the issue. These parts can come from mass production. They should all share the same suspension, but can be either Iris 11.1 or 11.3.1 depending on schedule.