Alternatively, the wind farm may have to adjust its reactive power consumption or production in order to control the voltage to a set point.
This is usually the voltage at the PCC, but other locations may be specified.
There may be requirements on the accuracy of control and the speed of response.
Fast control may be difficult to achieve, depending on the capabilities of the wind farm’s SCADA communications system.