Thus, human workers should go to the basement of the reactor room, remove the around 200 kg concrete
plug that closes the plug hole penetrating the floor of the reactor room from the ceiling of the basement, and push a long
stick to drive the manual ram drive mechanism to withdraw the fuel handling machine.