• Does the Fabricator or Manufacturer have written procedures for:
a. _____ Minor repairs?
b. _____ Major repairs?
c. _____ Documentation Re-inspection of repairs?
• Do Quality Control Personnel mark or otherwise indicate clearly on the components
when the following checks are completed and the disposition of their findings:
a. _____ Joint fit-up verified?
b. _____ Welding parameters verified?
c. _____ Final visual inspection completed?
d. _____ NDT completed (if required)?
e. _____ Confirmation of defect removal prior to repair welding (if required)?
f. _____ Dimensions of fabricated component verified?
g. _____ Fabricated structure of component verified for compliance with contract documents?