In some cases, the prototype user manual can be a basis for the final user documentation. However, this may not always be possible. The system development may be cancelled or the system may change to such an extent that a completely new user manual must to be written. The cost of writing the draft manual should be included in the requirements validation costs. Any subsequent saving in documentation costs is a bonus.