I try to list our requirement for online sand monitoring project krub
1. Sensor to install test header area have to possess appropriate elbow position?
2. Need to have adequate space for wiring RS-485 cable to interconnecting with Worley's Junction box, Ex e
3. Both WPS1 and WPS2 have to possess 24 Volt DC to be power supply to sensor
4. Check port for RS-232 available in PTT's telecom equipment that supports each other?
5. Check radio links equipment to be transmitter whole slot, port, address destination with PTTEP whether support or not?