2.2. Once the sampling appears marginal defectives during the final shipment inspection, the sampling must raise up one level to enlarge the sampling. If the result is marginal too, the lot may consider rejecting and need to rework by vendor unless there is the exemption authorized from the Quality Control Department Head.