Please find the below comments from roof company against to the MCS
drawings.
Their comments are below.
1, The total weights of their roof system = 25kg/m2
2, The maximum spacing between the steel purlin is 1200 mm centre to centre.
Please confirm with structure designer above matters and inform us for MCS
as soon as possible.