All collected information on the building and its HVAC systems, including during the walkthrough inspection, is considered to determine the quantity and locations of the required sampling points, a crucial task for the suitable planning of the measuring campaign. The next stage of the audit involves the measurement of the specified indicators, followed by the evaluation phase.