1. General
1.1. Introduction
The purpose of this document is to define a procedure for the proper control of buffer stop and wheel stop for Depot and Main Line supply for the MRT Blue Line Extension Project.
1.2. Reference
• MS-BL EXT_CT5-03 Track Survey
• MS-BL EXT_CT5-04 Track slab construction on viaduct
• MS-BL EXT_CT5-05 Track slab construction in tunnel
• MS-BL EXT_CT5-06 Depot Track Construction
• MS-BL EXT_CT5-19 Buffer Stop, Wheel stop Installation
• Volume 5 Outline Specifications
1.3. Units of Measure
Unit of measurement are metric
1.4. Related Submittals
N/A
1.5. Abbreviations
ITP = Inspection and Testing Procedure
MS = Method Statement
TSA = Temporary Staging Area
1.6. Tolerance
Refer. Volume 5 Outline Specifications