1. Push button at vaporizer panel and wait temperature at 70◦C. (About 30 minutes)
2. Open LPG valve for supply LPG to boiler at LPG station and boiler room.
3. Start boiler (Only 1 unit) at 10:00AM
4. Adjudge pressure at 0.35MPa but we can’t use main steam so we open bypass at stable pressure 0.1MPa although finish operate.