Key facilitating processes
Development Control
One key measure for the development control process is the
productivity in processing development applications (DAs),
as measured by the number of man-hours taken to clear a
case through URAs Electronic Development Application (EDA)
system. Figure 7. 4.4 shows that the time taken to clear a case
has improved from 15.2 man-hours per case in FYOS to 14.5
man-hours per case in FY07 despite an increase in the volume
of DAs by almost 1,000 cases over tile period.
Government land Sales
The indicator on "average man-days per sale site launched"
measures the efficiency and productivity of officers in preparing
the sites for sale. This improved gradually and steadily as seen
from the reduction in the average man-days for each sale site
from 44 .0 man-days in FYOS to 3 7. I man-days in FY07 (see
Figure 74.5)
Provision or real estate information
The average man-days required per survey is used to measure the
efforts required to collect real estate information from property
owners and developers through surveys. URA has consistently
reduced the average man-days per survey from 89 in FYOS to
84 in FY07 (see Figure 7.4. 6) . This is achieved by constantly
reviewing the process and leveraging on technology to facilitate
the collation, compilation and release of real estate data.
Marina Bay Development Agency
Marina Bay will become an exciting destination and playground
for all Singaporeans and people from all walks of life. Already,
activities such as the Oakley City Duathlon, Marina Bay Urban
Challenge and The Great Eastern Women 10k Run have
established themselves with enthusiastic participation.