Your best practice project has been shared in Mold UG , it was highlights that major modification done on input loading from one strip to two strip plus enchant pre-heating plate
I explained to team that there is possibility to apply for m/c which have idle time , they need to study m/c sequence and parameter.
Have APB experienced with two presses mold ?
Does this also require software modification ?
APK / APP have some DIS old model DP80 which is low window OS version , Has DIS mention any concern whether software upgradable or not ?