We are opening the seventh more powerful data centre in Nuremberg. At this moment this centre is able to storage the amount of power volume up to 11900 Mh/s. Due to the opening of data centre we remove all current restrictions on maximum purchase volume.
Engineering systems ensure uninterrupted operation of the data center 24 hours 7 days a week, 365 days a year. To do this, absolutely all the items are reserved, ie have a double, which will take over the load if the primary fails.