3-1 . For cost revision check function
I will make and store data output for the purpose of data collection and implementation of data integrity check process in the revised cost before and after implementation , and operation teaching .
1 . Cost before revision ( to perform the operation monitoring of two weeks before revision , and prompts the status confirmation to the end user if higher)
Table name general description of execution timing
Records that detects an error in the costing process in the KAITEIB1 costing error condition FTR. Not carried forward if not addressed to revision before processing . Separate sheet reference
In the standard cost of the item cost amount KAITEIB2 be acknowledged status quo is not zero , FTR cost zero state . Standard price is zero if you do not want to deal with the revision before processing . Separate sheet reference
Number of comparison and KAITEIB3 FTR FTR number validity STD ( validation ) . Three types of item cost (COST), routing cost (ROUTING), CC_RATE of ( wage rate ) . Separate sheet reference
Number of comparison and KAITEIB4 FTR FTR number validity II STD ( validation ) . CCN of material costs above , ML another PM by Category number . Separate sheet reference
Detection of Kian match FTR cost detail records and cost KAITEIB5 file mismatch FTR cost record . Separate sheet reference
KAITEIB6 " standard cost for deletion
Number . Separate reference sheet carried forward for cost does not exist in the ( number ) "FTR, be deleted if it is out of stock , plans, etc.
KAITEIB7 " standard cost for deletion
Line . Separate reference sheet carried forward for cost does not exist in the (item ) "FTR, be deleted if it is out of stock , plans, etc.