In process we need the length of PP woven 4.95meters/pc, but we have to drag it out to cut 5 meters (leave 0.05meter in case of cutting is not straight) caused losing 0.05meter per piece, we cut 480pcs/day that means we lose 24meters/day costs 888days/day. Because of there is no any length blocking both end edges.