Process Safety:
• Arrange to get Quantitative Risk Assessment (QRA) done with latest software available
• Write down emergency shutdown procedures in plant for sequential closure of plants during emergency
• Write down safety ‘Work Permit’ closure procedure
Engineering:
• Prepare a policy to procure equipment along with its safety fixture.(Reference procurement of new Transformer without Nitrogen Inerting)
• In view of the recent accident in transformer area, follow the work permit procedures strictly
• For handling Zinc sIabs instead of current method, consider horizontal mechanical swing/slide type table that will allow employee to push the slab instead of lifting it.
• In view of very high rate of corrosion due to storage & handling of corrosives, consider improving frequency of structural stability tests.
• Provide either Nitrogen inerting or sprinkler system for both the transformers
• Remove water from the trenches, clean and fill those trenches with sand
• Apply fire retardant paints to electrical cables specially in high voltage lines
• Provide rubber mats in front as well as backside of electric panels
• Provide boards of “ENTRY FOR AUTHORISED PERSONS ONLY”
• Provide Resuscitation boards inside panel rooms
• Replace all the missing guards on pump couplings, belt drives, immediately
• Provide latches to all crane hooks
Occupational health:
• First aid box should be placed in all departments / sections.
• The contents in the first aid boxes should be as per the minimum requirements.
• Prepare Human Resource (HR) guidelines for admitting injured employee to pre decided hospital to avoid delay Fire prevention/Fighting
Page 5
Process Safety:
• Arrange to get Quantitative Risk Assessment (QRA) done with latest software available
• Write down emergency shutdown procedures in plant for sequential closure of plants during emergency
• Write down safety ‘Work Permit’ closure procedure
Engineering:
• Prepare a policy to procure equipment along with its safety fixture.(Reference procurement of new Transformer without Nitrogen Inerting)
• In view of the recent accident in transformer area, follow the work permit procedures strictly
• For handling Zinc sIabs instead of current method, consider horizontal mechanical swing/slide type table that will allow employee to push the slab instead of lifting it.
• In view of very high rate of corrosion due to storage & handling of corrosives, consider improving frequency of structural stability tests.
• Provide either Nitrogen inerting or sprinkler system for both the transformers
• Remove water from the trenches, clean and fill those trenches with sand
• Apply fire retardant paints to electrical cables specially in high voltage lines
• Provide rubber mats in front as well as backside of electric panels
• Provide boards of “ENTRY FOR AUTHORISED PERSONS ONLY”
• Provide Resuscitation boards inside panel rooms
• Replace all the missing guards on pump couplings, belt drives, immediately
• Provide latches to all crane hooks
Occupational health:
• First aid box should be placed in all departments / sections.
• The contents in the first aid boxes should be as per the minimum requirements.
• Prepare Human Resource (HR) guidelines for admitting injured employee to pre decided hospital to avoid delay Fire prevention/Fighting