In order to have the design of the micro hydro power there
is a need to fix the position of the power house where the
proposed power station is to be situated. The power house
was proposed to be located in an area 60m away from the
reservoir. The next task in the process was to calculate the
head difference between the turbine and the available head
of the reservoir. Using the GPS technology the head of the
reservoir was calculated and was found to be 26m. The length
of the penstock required is 55m.