After the acceptance tests have been performed and it has been verified that the
relay can meet the intended specifications, functional tests should be performed.
The specific procedure for each relay depends on the type of protection involved
and the logic scheme implemented. A general procedure for carrying out these tests
for a numerical protection arrangement is given as follows