API RECOMMENDED PRACTICE 2D
BREAK LOAD) as originally furnished or as recommended by
the crane or rope manufacturer. End connections should be the
same as originally furnished or as recommended by the crane
manufacturer or other qualiÞed sources (see item 4).
3. Load hoist ropes replaced with rope of the same diameter,
length, construction, grade (EITHER GALVANIZED OR
BRIGHT WITH THE SAME MINIMUM BREAK LOAD)
as originally furnished or as recommended by the crane manufacturer
or other qualiÞed sources (see item 4).
4. When the replacement rope is other than the type and
grade that was originally furnished, all load rating charts
should be reviewed by the original crane manufacturer, an
API SpeciÞcation 2C licensed crane manufacturer, authorized
surveyor, or an engineer experienced in crane wire rope
applications.
C.5.1.4b Recommended Storage and Handling
Procedures
1. Stored rope shall be covered in a well-ventilated area and
away from excessive heat.
2. Where covered storage is not available, the rope and reel
shall be covered with waterproof material. For long periods of
storage, apply a lubricant coating to the outside layer of rope
on the reel.
3. On a crane that is to be out of service for long periods of
time, apply the proper lubricant to all wire rope.
4. Care shall be taken during shipping and handling of the
reel and rope to prevent damage to the rope. The loose end of
the rope on the reel shall be secured properly to the reel. Do
not drive a nail through the center of the wire rope.
5. Special considerations should be given in high heat areas
where elevated corrosion and loss of lubrication can contribute
to reduced shelf life.
C.5.1.4d Installation Guidelines
1. To avoid introduction of twist into the rope while reeving,
remove the rope from the same side of the reel as it will be
operated on the drum, top-to-top or bottom-to-bottom. See
Figure G.7.
2. Spool rope under tension to properly seat the rope on the
drum. Particular care shall be taken in spooling the Þrst layer.
3. Care shall be taken to assure that the boom, main and auxiliary
hoist systems are reeved for the speciÞc crane
conÞguration in use.
4. When reeving through the sheave system, avoid kinks or
looping which could damage the rope.
5. Some wire rope manufacturers recommend that welded
wire rope ends be left intact, while others recommend that all
welded ends be properly cut off. Consult with the crane or
wire rope manufacturer on recommended procedures. High
performance wire rope, particularly compacted rotation-resistant
wire rope, may have special manufacturer recommendations
for end preparation prior to cutting which should
be followed.
6. Swivels shall not be used at the dead end of multi-part
hoist systems with rotation-resistant rope.
7. Swivels shall be installed at the dead end of single part
systems following the recommendation of the crane and/or
wire rope manufacturer. The swivel is typically an integral
part of the overhaul ball and may be of a top or bottom swivel
design.
8. New rope, when Þrst installed, shall be broken in by
slowly lifting and lowering a light load several cycles
through the entire hoist mode. (See section 3.2.3f) BEGIN
CYCLING THE ROPE AT 0 DEGREES BOOM ANGLE
TO MINIMIZE TWISTS CAUSED BY SHEAVE
RESISTANCE.
C.5.1.4i Wedge Type Socket Installation
Guidelines
1. Verify that the socket and wedge are the correct size for
the rope in use. Sockets may be adaptable to two sizes of rope
but the wedge is for one size of rope only. The rope size is
cast or stamped in both the socket and wedge. Check the
socket eye and pin for roundness and wear. A pin keeper shall
always be used with the pin.
2. Check socket and wedge for rough edges or burrs; remove
before use.
3. Cut off any welded rope end before application of socket
and wedge, unless the wire rope manufacturer requires the
welded end to remain.
Figure G.6—Right and Wrong Way to Measure Wire Rope Diameter
Actual diameter
1 2 3 1 2 3
A
B. Correct C. Incorrect
Copyright American Petroleum Institute
Reproduced by IHS under license with API
Document provided
API RECOMMENDED PRACTICE 2DBREAK LOAD) as originally furnished or as recommended bythe crane or rope manufacturer. End connections should be thesame as originally furnished or as recommended by the cranemanufacturer or other qualiÞed sources (see item 4).3. Load hoist ropes replaced with rope of the same diameter,length, construction, grade (EITHER GALVANIZED ORBRIGHT WITH THE SAME MINIMUM BREAK LOAD)as originally furnished or as recommended by the crane manufactureror other qualiÞed sources (see item 4).4. When the replacement rope is other than the type andgrade that was originally furnished, all load rating chartsshould be reviewed by the original crane manufacturer, anAPI SpeciÞcation 2C licensed crane manufacturer, authorizedsurveyor, or an engineer experienced in crane wire ropeapplications.C.5.1.4b Recommended Storage and HandlingProcedures1. Stored rope shall be covered in a well-ventilated area andaway from excessive heat.2. Where covered storage is not available, the rope and reelshall be covered with waterproof material. For long periods ofstorage, apply a lubricant coating to the outside layer of ropeon the reel.3. On a crane that is to be out of service for long periods oftime, apply the proper lubricant to all wire rope.4. Care shall be taken during shipping and handling of thereel and rope to prevent damage to the rope. The loose end ofthe rope on the reel shall be secured properly to the reel. Donot drive a nail through the center of the wire rope.5. Special considerations should be given in high heat areaswhere elevated corrosion and loss of lubrication can contributeto reduced shelf life.C.5.1.4d Installation Guidelines1. To avoid introduction of twist into the rope while reeving,remove the rope from the same side of the reel as it will beoperated on the drum, top-to-top or bottom-to-bottom. SeeFigure G.7.2. Spool rope under tension to properly seat the rope on thedrum. Particular care shall be taken in spooling the Þrst layer.3. Care shall be taken to assure that the boom, main and auxiliaryhoist systems are reeved for the speciÞc craneconÞguration in use.4. When reeving through the sheave system, avoid kinks orlooping which could damage the rope.5. Some wire rope manufacturers recommend that weldedwire rope ends be left intact, while others recommend that allwelded ends be properly cut off. Consult with the crane orwire rope manufacturer on recommended procedures. Highperformance wire rope, particularly compacted rotation-resistantwire rope, may have special manufacturer recommendationsfor end preparation prior to cutting which shouldbe followed.6. Swivels shall not be used at the dead end of multi-parthoist systems with rotation-resistant rope.7. Swivels shall be installed at the dead end of single partsystems following the recommendation of the crane and/orwire rope manufacturer. The swivel is typically an integralpart of the overhaul ball and may be of a top or bottom swiveldesign.8. New rope, when Þrst installed, shall be broken in byslowly lifting and lowering a light load several cyclesthrough the entire hoist mode. (See section 3.2.3f) BEGINCYCLING THE ROPE AT 0 DEGREES BOOM ANGLETO MINIMIZE TWISTS CAUSED BY SHEAVERESISTANCE.C.5.1.4i Wedge Type Socket InstallationGuidelines1. Verify that the socket and wedge are the correct size forthe rope in use. Sockets may be adaptable to two sizes of ropebut the wedge is for one size of rope only. The rope size iscast or stamped in both the socket and wedge. Check thesocket eye and pin for roundness and wear. A pin keeper shallalways be used with the pin.2. Check socket and wedge for rough edges or burrs; removebefore use.3. Cut off any welded rope end before application of socketand wedge, unless the wire rope manufacturer requires thewelded end to remain.Figure G.6—Right and Wrong Way to Measure Wire Rope DiameterActual diameter1 2 3 1 2 3AB. Correct C. IncorrectCopyright American Petroleum InstituteReproduced by IHS under license with APIDocument provided
การแปล กรุณารอสักครู่..
API API RECOMMENDED PRACTICE 2D
โหลด BREAK LOAD) as originally furnished or as recommended by
ตามที่ได้รับการตกแต่งเดิมหรือตามคำแนะนำของเครนหรือผู้ผลิตเชือก การเชื่อมต่อ the crane or rope manufacturer. End connections should be the
ควรจะเป็นเช่นเดียวกับการตกแต่งด้วยเฟอร์นิเจอร์เดิมหรือตามคำแนะนำของเครนผู้ผลิตหรือแหล่งอื่นsame as originally furnished or as recommended by the crane
ๆ manufacturer or other qualiÞed sources (see item 4).
3 3. Load hoist ropes replaced with rope of the same diameter,
length, construction, grade (EITHER GALVANIZED OR
BRIGHT WITH THE SAME MINIMUM BREAK LOAD)
as originally furnished or as recommended by the crane manufacturer
or other qualiÞed sources (see item 4).
4. When the replacement rope is other than the type and
grade that was originally furnished, all load rating charts
should be reviewed by the original crane manufacturer, an
API SpeciÞcation 2C licensed crane manufacturer, authorized
surveyor, or an engineer experienced in crane wire rope
applications.
C.5.1.4b Recommended Storage and Handling
Procedures
1. Stored rope shall be covered in a well-ventilated area and
away from excessive heat.
2. Where covered storage is not available, the rope and reel
shall be covered with waterproof material. For long periods of
storage, apply a lubricant coating to the outside layer of rope
on the reel.
3. On a crane that is to be out of service for long periods of
time, apply the proper lubricant to all wire rope.
4. Care shall be taken during shipping and handling of the
reel and rope to prevent damage to the rope. The loose end of
the rope on the reel shall be secured properly to the reel. Do
not drive a nail through the center of the wire rope.
5. Special considerations should be given in high heat areas
where elevated corrosion and loss of lubrication can contribute
to reduced shelf life.
C.5.1.4d Installation Guidelines
1. To avoid introduction of twist into the rope while reeving,
remove the rope from the same side of the reel as it will be
operated on the drum, top-to-top or bottom-to-bottom. See
Figure G.7.
2. Spool rope under tension to properly seat the rope on the
drum. Particular care shall be taken in spooling the Þrst layer.
3. Care shall be taken to assure that the boom, main and auxiliary
hoist systems are reeved for the speciÞc crane
conÞguration in use.
4. When reeving through the sheave system, avoid kinks or
looping which could damage the rope.
5. Some wire rope manufacturers recommend that welded
wire rope ends be left intact, while others recommend that all
welded ends be properly cut off. Consult with the crane or
wire rope manufacturer on recommended procedures. High
performance wire rope, particularly compacted rotation-resistant
wire rope, may have special manufacturer recommendations
for end preparation prior to cutting which should
be followed.
6. Swivels shall not be used at the dead end of multi-part
hoist systems with rotation-resistant rope.
7. Swivels shall be installed at the dead end of single part
systems following the recommendation of the crane and/or
wire rope manufacturer. The swivel is typically an integral
part of the overhaul ball and may be of a top or bottom swivel
design.
8. New rope, when Þrst installed, shall be broken in by
slowly lifting and lowering a light load several cycles
through the entire hoist mode. (See section 3.2.3f) BEGIN
CYCLING THE ROPE AT 0 DEGREES BOOM ANGLE
TO MINIMIZE TWISTS CAUSED BY SHEAVE
RESISTANCE.
C.5.1.4i Wedge Type Socket Installation
Guidelines
1. Verify that the socket and wedge are the correct size for
the rope in use. Sockets may be adaptable to two sizes of rope
but the wedge is for one size of rope only. The rope size is
cast or stamped in both the socket and wedge. Check the
socket eye and pin for roundness and wear. A pin keeper shall
always be used with the pin.
2. Check socket and wedge for rough edges or burrs; remove
before use.
3. Cut off any welded rope end before application of socket
and wedge, unless the wire rope manufacturer requires the
welded end to remain.
Figure G.6—Right and Wrong Way to Measure Wire Rope Diameter
Actual diameter
1 2 3 1 2 3
A
B. Correct C. Incorrect
Copyright American Petroleum Institute
Reproduced by IHS under license with API
Document provided
การแปล กรุณารอสักครู่..
API แนะนำการปฏิบัติ 2D
โหลดแบ่ง ) แต่เดิมหรือตกแต่งเป็นที่แนะนำโดย
เครนหรือผู้ผลิตเชือก สิ้นสุดการเชื่อมต่อควรจะ
เหมือนเดิมหรือตกแต่งตามที่แนะนำโดยผู้ผลิต หรืออื่น ๆ Þเครน
quali เอ็ดแหล่ง ( ดูข้อ 4 )
3 เชือกกับเชือกของรอกโหลดแทนกันเส้นผ่าศูนย์กลาง
ความยาว , ก่อสร้าง , เกรด ( Galvanized หรือ
สดใสกับโหลดแบ่งขั้นต่ำ )
เช่นเดิมหรือตกแต่งตามที่แนะนำโดยผู้ผลิต หรืออื่น ๆ Þเครน
quali เอ็ดแหล่ง ( ดูข้อ 4 )
4 เมื่อการเปลี่ยนเชือกเป็นมากกว่าประเภทและ
เกรดนั้นเดิมที ตกแต่งโหลดแผนภูมิคะแนน
ควรจะตรวจสอบโดยผู้ผลิตเครนต้นฉบับ ,
API speci Þใน อนุญาต ผลิต อนุญาต
2C เครน , นักสำรวจหรือวิศวกรที่มีประสบการณ์ในการใช้เครนลวดเชือก
.
c.5.1.4b แนะนำขั้นตอนการจัดเก็บและการจัดการ
1 การเก็บเชือกจะครอบคลุมในพื้นที่ที่อากาศถ่ายเทได้ดี ห่างจากความร้อนที่มากเกินไปและ
.
2 ที่คลุมกระเป๋าไม่สามารถใช้ได้ , เชือกและรีล
จะปกคลุมด้วยวัสดุกันน้ำ . สำหรับรอบระยะเวลาที่ยาวนานของ
กระเป๋า ใช้หล่อลื่นเคลือบชั้นนอกเชือก
บนรีล .
3 บนเครนที่ออกมาให้บริการสำหรับระยะเวลานานของเวลา
ใช้สารหล่อลื่นที่เหมาะสมกับสายเชือก .
4 การดูแลจะต้องถ่ายในระหว่างการขนส่งและการจัดการของ
รอกและเชือกเพื่อป้องกันความเสียหายกับเชือก ปลายหลวมของ
เชือกบนรีลจะปลอดภัยอย่างถูกต้องกับรีล ทำ
ไม่ตอกตะปูทะลุกึ่งกลางของเชือกลวด .
5ควรได้รับการพิจารณาพิเศษในพื้นที่
ความร้อนสูงที่การกัดกร่อนสูงและการสูญเสียของการหล่อลื่นสามารถมีส่วนร่วม
ลดอายุการเก็บรักษา c.5.1.4d ติดตั้งแนวทาง
1 เพื่อหลีกเลี่ยงการบิดในขณะ reeving
เอาเชือก , เชือกจากด้านเดียวกันของรีลเป็น
ผ่าตัดกลองด้านบนด้านบนหรือด้านล่างที่ด้านล่าง เห็นรูป g.7
.
2ม้วนเชือกภายใต้ความตึงเครียดที่จะต้องนั่งบนเชือก
กลอง ดูแลโดยเฉพาะจะถูกจัดการÞ RST ชั้น .
3 การดูแลจะต้องถ่ายเพื่อให้มั่นใจว่าบูม หลักและระบบรอกช่วย
เป็นข้าราชการระดับสูงสำหรับกาÞ c con Þ guration ใช้เครน
.
4 เมื่อ reeving ผ่านระบบลูกรอก หลีกเลี่ยงข้อผิดพลาดที่อาจเกิดความเสียหายหรือ
ทำเป็นเชือก .
5บางผู้ผลิตเชือกลวดที่ปลายเชือกลวดเชื่อมแนะนำ
เหลือเหมือนเดิม ในขณะที่คนอื่นแนะนำว่า
รอยปลายถูกตัด ปรึกษากับเครน
เชือกลวดผู้ผลิตในขั้นตอนที่แนะนำ เชือกลวดประสิทธิภาพสูง
โดยเฉพาะกระชับเชือกลวดความต้านทานการหมุน อาจมีข้อเสนอแนะพิเศษผู้ผลิต
สำหรับการเตรียมการก่อนที่จะตัดจบตาม ซึ่งควรจะ
.
6 หมุนจะไม่ใช้ในปลายตายของ
ส่วนหลายระบบป้องกันการหมุนรอกเชือก .
7 หมุนจะถูกติดตั้งในทางตันของระบบส่วน
เดียวตามคำแนะนำของเครนและ / หรือ
ผู้ผลิตเชือกลวด ที่หมุนโดยทั่วไปจะเป็น
ส่วนหนึ่งของการยกเครื่องลูกและอาจจะในด้านบนหรือด้านล่างออกแบบหมุน
.
8 เชือกใหม่ เมื่อÞ RST ติดตั้งจะถูกหักโดย
ค่อยๆยกและลดโหลดไฟหลายรอบ
ผ่านโหมดรอกทั้งหมด ( ดูมาตรา 3.2.3f ) เริ่มต้น
จักรยานเชือกที่มุม 0 องศา บูม
ลดบิดเกิดจากลูกรอก
c.5.1.4i ลิ่มชนิดต้านทาน แนวทางการติดตั้งซ็อกเก็ต
1ตรวจสอบว่าซ็อกเก็ตและลิ่มมีขนาดถูกต้อง
เชือกที่ใช้ ซ็อกเก็ตอาจจะปรับตัวได้สองขนาดของเชือก
แต่ลิ่มสำหรับขนาดของเชือกเท่านั้น เชือกขนาด
หล่อ หรือประทับตราในซ็อกเก็ตและลิ่ม ตรวจสอบ
เบ้าตาและขา เพื่อความกลมและสวม ขาผู้รักษาประตูจะมักใช้กับขา
.
2 ตรวจสอบตำแหน่งและลิ่มขอบหยาบหรือขรุขระ
; ลบก่อนใช้
3 ตัดปิดรอยเชือกสิ้นสุดก่อนการใช้ซ็อกเก็ต
และเวดจ์ นอกจากเชือกลวดที่ผู้ผลิตต้องการ
รอยจบยังคงอยู่ .
รูป g.6-right และผิดวิธีการวัดเชือกลวดขนาดเส้นผ่านศูนย์กลาง
จริง 1 2 3 1 2 3
A
B C ไม่ถูกต้องลิขสิทธิ์ถูกต้อง
โดยในสถาบันปิโตรเลียมอเมริกันทำซ้ำ ภายใต้ใบอนุญาตพร้อมด้วยเอกสาร API
ให้
การแปล กรุณารอสักครู่..