Plan and Monitoring Work.
Utility Roof Plan & Section.
Slab Re-bar.
Install Wire Mesh Roofing Work.
Rebar Slab Work, CB.Wall Toilet2, Lean Con.Toilet1.
Distribution Control System.
Install HV.Pole for Power Supply.
Install Pope Septic Tank System (Kitchen Office) Before Casting Tank Slab.
Safety Patrol and Document.
Safety Patrol and Document.
Form Work Water Tank Utility Bldg.
Document & Casting Concrete Gutter.
Casting Concrete Gutter.
Line - Level Gutter.
Mark Line Column.
Re-bar Slab Work.
Carpark Detail & Section.
Document Shop Dwg & Summary Concrete.