(1) the installation of measuring head on the ground. To install the measuring head on the wedge, which the hammer down on the ground. And until the mid wedge into the soil
(2). Installation of measuring head floor building. To install the sensor based on the measuring head to the floor with sticky wax or glue
.(3) the installation head temple building wall or wall. To install the measuring head on the wedge which penetrate building walls or walls or based on measuring head with a building wall or the wall with the other materials in the stable.