The opportunity to learn with of Fujikura auto-motive (Thailand) co., Ltd. in the process thousands of wiring sets for automobiles, tape, Part B and C, No.A process thousands of tapes are the thousands of features. The student cooperative has noticed and found that each employee will take thousands of tape for each section. Because of the differences of each tape features thousands of parts and expertise of the employees, which resulted in a production line set the wires in the car Part No. A B and C do not have continuity, and productivity is not as the goal. Therefore, a student cooperative education plan made. The balance in the production car series power cord Part No. A B and C in order to obtain a result based on the goals and are produced continuously.