The main ground cable may be buried in the backfill for the column footings and foundation
walls. It shall be located at a minimum of 18 inches outside any building wall and a
minimum of 18 inches below finished grade. The cable shall be installed with sufficient
slack so that the movement due to backfilling or soil movement will not stress the cable or
bond.