A401 SP ARTICLE 9, SUBCONTRACTOR
§ 4.5.2 The Subcontractor shall perform the Sustainable Measures required to be performed by the Subcontractor in accordance with the Subcontract Documents; however, nothing contained in this Section 4.5 shall be construed as a guarantee or warranty by the Subcontractor that the Project will achieve the Sustainable Objective.