We mean to say, can you share the data which was loaded in System so as to enable us to start the Tool design activity as soon as possible. (Lead time : 30 Days)
You can share the both 2D & 3D files through DB link.
Please understand this item takes 110 Days for Tooling Manufacturing lead time.