1110-1620 FAS Operating instructions
v.3.10 © Lamina System AB 4-10
4.6 Top conveyor
1. Select number of ball rolls (1) by moving the ball profilers (2) and adjust number of belts to the new size. To move belts, you loosen the belt tension (3) placed under the top conveyor.
2. Adjust the pusher bar (4) by activating PUSHER on the display and then move the bar to the side edge of the sheet.
4
3
1
2