Khun Rakchart presented disaster recovery annual test result at Metro system cooperation held during 22-26 Aug 2016. There were 40 seats PC on DRC site for H/O staff to work, the total time for set up CIA server and restore 3 database was about 6 hours. Accounting GL server was 1 hour, set up file server 1 hour, xxxter for branch 15 minutes and 3 terminal server for branches 2 hours and 40 PCs with LAN network 4 hours. The test was successful with all the mentioned activities ran in parrarel.