The operating ETPs in both factories are running over their capacities. The physical water is not treated and results in white stream to the pond. The measurement of pollution is in the limit however the total dissolved solids are not measured (not legally required). The sludge is considered as not hazardous waste (containing Pb, Cd within the limit) and is either collected and stored as non-hazardous waste (factory one) or land filled (factory two).