The co-digestion influent was daily prepared, just before the feeding, in order to avoid uncontrolled degradation.
The reactors were purged and then fed once a day;
both effluent and influent were collected through a pipe using a 100 mL syringe. Biogas production is reported at standard temperature and pressure conditions