The flex testing test pieces requirement has changed, although it is still wet flex 100,000 pcs - and the same frequency - the lab are now changing from "along and across" so 2 test pieces per test - to "along and across - either and/or" so it means that although we are testing along and across - it is not both per test - it is along one test, across the other.
For example - if the testing frequency requires 10 tests, the lab would test 5 along and 5 across.
Where up until Songkran, they would test 10 along and 10 across. - so the test pieces now is about half.
This should greatly reduce any backlog in the lab, so the queue should be reducing now.