All,
How many vacancies of OPS analyst do we have? Do we replace with GG7 or we can replace with GG6 for junior so the PIR want look bad? I prefer not to go to T100 for adjustment because manager think the PIR is low. Can we make sure that we bench the new hire in the correct job grade? Perhaps it is time to review all Analyst positions and clean up on the job grade.
Pam ka – please prepare data on OPS Analyst, Log Analyst, BD analyst, G TPT Analyst, Supply Chain Trainer, CS Analyst (FM), etc. Job Grade, PIR, and schedule a meeting to review these data on Monday Oct 12.